日本变态残虐特级a片受难,成人做爰a片免费播放,brazzers欧美巨大,久久精品国产99国产精品导航

NEWS

Great news
Click Online Message

TEL:0391-5299981

EMAIL:qyyangnan@vip.163.com

ADDRESS:South Section of Taihang Avenue, QinYang

company news
Great news
Home > Juli News > company news

Juli Bending Machine Operation Procedure

Release time:2013-08-11 09:02:16 Source of the article:qyjljc Number of clicks:1637

  First, mechanical coiling machine, automatic coiling machine before starting preparation

  1. Check for any abnormalities in the parts. The fastening screws (caps) must not be loose. The brake should be normal and reliable.

  2. Adjust the distance of the reel strictly according to the thickness of the plate, and do not overload the work. It is not possible to roll a workpiece that exceeds the specified range of mechanical properties.

  Second, the mechanical coiling machine, automatic winding machine operation notes

  1, must be placed in the workpiece, after the position is positive

  1. Check for any abnormalities in the parts. The fastening screws (caps) must not be loose. The brake should be normal and reliable.

  2. Adjust the distance of the reel strictly according to the thickness of the plate, and do not overload the work. It is not possible to roll a workpiece that exceeds the specified range of mechanical properties.

  Second, the mechanical coiling machine, automatic winding machine operation notes

  1. The workpiece must be placed in a stable position, and the operation can be started after the position is correct. The signal should be clearly specified and one person should be assigned.

  2. The hand should not be placed on the rolled steel plate. It is not allowed to check with the sample. After the shutdown, the sample is used to check the roundness.

  3. When the workpiece is not fully rounded, when rolling to the end of the steel plate, a certain amount of allowance should be reserved to prevent the workpiece from falling and hurting people.

  4. When working, it is strictly forbidden to stand on the workpiece, and it is not allowed to find the roundness on the rolled cylinder.

  5. When rolling a thicker, larger diameter cylinder or a workpiece with a higher material strength, the pneumatic tool should lower the moving roller a small amount and roll it over a plurality of times.

  6. When rolling a narrow cylinder, it should be placed in the middle of the roll.

  7. After the workpiece enters the roll, the hand and clothes should be prevented from being caught in the roll.

  Third, mechanical coiling machine, automatic coiling machine shutdown notice

  1. If it is found that the machine is running abnormally, stop it immediately and check the adjustment and repair.

  2. Disconnect the switch and cut off the power.



  • PHONE
  • message
    MESSAGE
  • map
    MAP
  • ewm
    QR CODE
  • 成熟闷骚女邻居引诱2| 国产亚洲精品久久久久久久久动漫| 另类sm一区二区三区免费视频| 成人电影免费看| 无码日韩精品一区二区人妻| 一本大道东京热无码视频| 精品无人国产偷自产在线| 少妇高潮毛片免费看a片| 亚洲国产精品久久久久久久| 用舌头去添高潮无码视频| 亚洲av永久无码精品表情包| 少妇洁白无删减版178章| 欧美丰满大胆少妇xxxooo| 女口述第一次放进去的感受| china中国妞tubesex| 少妇高潮一区二区三区99| 1000部啪啪未满十八勿入免费| 欧美三曰本三级少妇三99| 中文字幕av一区| 老师你的真嫩真紧av視頻| 四虎成人精品永久免费av| 国内精品久久久久久99蜜桃 | bbox撕裂bass俄罗斯| 国产伦精品一区二区三区免费迷 | 国产人妻大战黑人20p| 久久日本片精品AAAAA国产| 黑人超级bigblack| 国产福利一区二区三区在线 | 23部禽女乱小说内裤畸情视频| GOGO少妇无码肉肉视频| 国产又色又爽又黄刺激视频 | 日本亲与子乱人妻ihd| 打屁股羞耻扒开撅着| 奶涨边摸边做爰爽别停快点文| 亚洲国产精品无码久久sm| 女人被添高潮全过程A片| 老师好爽要尿了潮喷了视频高潮| 性欧美xxxxx极品少妇| 亚洲偷偷自拍高清| 亚洲欧美一区二区成人片| 色一情一乱一伦一区二区三区|